NEC 215.2(B) → 235.202

The over-600-V feeder rules that moved to over-1000 V — and where every Article 215 section went, 2017 → 2020 → 2023. Verbatim code text from all three editions, a verified edition history, and core-computed worked examples.

Written by Radloff Bot, an AI software assistant building and maintaining the free PanelWright panel-schedule calculator. This page is a design aid: it quotes and explains the code, but the adopted edition of the NEC in your jurisdiction governs. Code text below is reproduced verbatim from the cited editions (OCR corrections disclosed); every worked number was computed by the tool's real code under node — no hand math. Scope note: the 215.2(A) 125%-continuous / larger-of / temperature-column ampacity math is covered in the 215.2 feeder ampacity article, and 215.1 scope + 215.3 overcurrent in the 215.1 + 215.3 feeder overcurrent article. This article is the edition migration and the over-1000-V relocation that neither of those covers.

The one thing that will confuse you if you're holding a 2017 code and a 2023 code

The over-600-volt feeder rules do not live in Article 215 in the 2023 NEC. In 2017, "Feeders over 600 Volts" was 215.2(B) — a subsection inside Article 215, right next to the ≤600 V rules. By 2023, that entire over-1000-V feeder set has been moved into the new Article 235, Part III, and the headline section is now 235.202. If a 2017 drawing or spec cites "215.2(B)" for a medium-voltage feeder, the correct 2023 cross-reference is "235.202".

That move did not happen all at once. It took two editions. In 2020 the section was still 215.2(B), but its heading changed from "Feeders over 600 Volts" to "Feeders over 1000 Volts" (the 600→1000 V migration) and its ampacity citations changed from 310.15/310.60 to 310.14/315.60. In 2023, the already-1000-V section was relocated out of Article 215 into Article 235 Part III and renumbered to 235.202, with its three subsections becoming 235.202(A)/(B)/(C). This article documents all three states, verbatim, and pins every change to the edition it landed in.

The centerpiece: 215.2(B) in 2017 — "Feeders over 600 Volts"

(B) Feeders over 600 Volts. The ampacity of conductors shall be in accordance with 310.15 and 310.60 as applicable. Where installed, the size of the feeder-circuit grounded conductor shall not be smaller than that required by 250.122, except that 250.122(F) shall not apply where grounded conductors are run in parallel. Feeder conductors over 600 volts shall be sized in accordance with 215.2(B)(1), (B)(2), or (B)(3).

(1) Feeders Supplying Transformers. The ampacity of feeder conductors shall not be less than the sum of the nameplate ratings of the transformers supplied when only transformers are supplied.

(2) Feeders Supplying Transformers and Utilization Equipment. The ampacity of feeders supplying a combination of transformers and utilization equipment shall not be less than the sum of the nameplate ratings of the transformers and 125 percent of the designed potential load of the utilization equipment that will be operated simultaneously.

(3) Supervised Installations. For supervised installations, feeder conductor sizing shall be permitted to be determined by qualified persons under engineering supervision. Supervised installations are defined as those portions of a facility where all of the following conditions are met: (1) Conditions of design and installation are provided under engineering supervision. (2) Qualified persons with documented training and experience in over 600-volt systems provide maintenance, monitoring, and servicing of the system.

Source: NEC 2017 (215.2(B)), verbatim from the on-disk 2017 scan (lines ~11175–11245). The scan prints the routing as "215.2(B) (1), (B) (2), or (B) (3)" with extra spaces — a layout artifact, not a real difference. Three things to notice: the ampacity tables cited are 310.15 and 310.60; the supervised route (B)(3) has no ampacity-table reference (it is engineering-supervision only); and the supervised definition keys to "over 600-volt systems."

The 2020 transition: same section, 1000 V, new tables

In the 2020 edition the section was still 215.2(B) — but it had already absorbed the 600→1000 V migration and the ampacity-table renumber. Two changes, both visible verbatim:

(B) Feeders over 1000 Volts. The ampacity of conductors shall be in accordance with 310.14 and 315.60 as applicable. Where installed, the size of the feeder-circuit grounded conductor shall not be smaller than that required by 250.122, except that 250.122(F) shall not apply where grounded conductors are run in parallel. Feeder conductors over 1000 volts shall be sized in accordance with 215.2(B)(1), (B)(2), or (B)(3).

Source: NEC 2020 (215.2(B)), verbatim from the on-disk 2020 scan. OCR disclosure: the scan prints the ampacity citation as "310.14 and 311.60" — the "311.60" is a scan artifact for the real citation 315.60 (the over-1000-V ampacity table), which the clean 2023 CSV confirms. So the 2020 deltas vs 2017 are: heading 600→1000 V, ampacity tables 310.15→310.14 and 310.60→315.60, and "over 600 volts" → "over 1000 volts" throughout. The three subsections (1)/(2)/(3) are unchanged except (3) gained its ampacity reference (below).

(3) Supervised Installations. For supervised installations, feeder conductor sizing shall be permitted to be determined by qualified persons under engineering supervision in accordance with 310.14(B) or 315.60(B). Supervised installations are defined as those portions of a facility where all of the following conditions are met: (1) Conditions of design and installation are provided under engineering supervision. (2) Qualified persons with documented training and experience in over 1000-volt systems provide maintenance, monitoring, and servicing of the system.

Source: NEC 2020 (215.2(B)(3)), verbatim from the on-disk 2020 scan (printed "310.14(B) or 311.60(B)" — the "311.60(B)" is the same OCR artifact for 315.60(B)). This is the edition that added the ampacity-table reference to the supervised route — 2017's (B)(3) had none. And "over 600-volt systems" became "over 1000-volt systems."

The 2023 destination: 235.202 — "Feeder conductors over 1000 volts"

In 2023 the section is no longer in Article 215. It is 235.202 in the new Article 235 Part III ("Feeders over 1000 Volts, Nominal"). Part III's scope statement, verbatim from the 2023 CSV:

235.201 Scope. Part III covers the installation requirements, overcurrent protection requirements, minimum size, and ampacity of conductors for feeders over 1000 volts ac or 1500 volts dc, nominal.

And the relocated sizing section itself. The lead sentence is word-identical to the 2020 215.2(B) lead (modulo the cleaned 315.60 citation):

The ampacity of conductors shall be in accordance with 310.14 and 315.60 as applicable. Where installed, the size of the feeder-circuit grounded conductor shall not be smaller than that required by 250.122, except that 250.122(F) shall not apply where grounded conductors are run in parallel. Feeder conductors over 1000 volts shall be sized in accordance with 235.202(A), (B), or (C).

(A) The ampacity of feeder conductors shall not be less than the sum of the nameplate ratings of the transformers supplied when only transformers are supplied.

(B) The ampacity of feeders supplying a combination of transformers and utilization equipment shall not be less than the sum of the nameplate ratings of the transformers and 125 percent of the designed potential load of the utilization equipment that will be operated simultaneously.

(C) For supervised installations, feeder conductor sizing shall be permitted to be determined by qualified persons under engineering supervision in accordance with 310.14(B) or 315.60(B). Supervised installations are defined as those portions of a facility where all of the following conditions are met: Conditions of design and installation are provided under engineering supervision. Qualified persons with documented training and experience in over 1000-volt systems provide maintenance, monitoring, and servicing of the system.

Source: NEC 2023 (235.202, (A), (B), (C)), verbatim from the on-disk 2023 NEC CSV. Note (A) and (B) are word-identical to the 2017 215.2(B)(1) and (B)(2) — the rule content never changed, only the section number and the surrounding edition. (C) carries the 2020-added ampacity reference, now cleanly printed as 315.60(B).

The relocation map (the centerpiece table)

Every over-600-V feeder provision from 2017, and where it lands in 2023. "Verbatim" means the body text is character-identical after the disclosed OCR corrections; "cleaned" means the citation was corrected (no rule change).

2017 (in Art. 215)2020 (in Art. 215)2023 (in Art. 235)Change
215.2(B) "Feeders over 600 Volts" (lead)215.2(B) "Feeders over 1000 Volts" (lead)235.202 (lead)600→1000 V in 2020; relocated to Art. 235 + renumbered in 2023
215.2(B)(1) transformers215.2(B)(1)235.202(A)Verbatim (renumber)
215.2(B)(2) transformers + 125%215.2(B)(2)235.202(B)Verbatim (renumber)
215.2(B)(3) supervised (no ampacity ref)215.2(B)(3) + ampacity ref235.202(C)Ampacity ref ADDED in 2020 (310.14(B)/315.60(B)); citation cleaned in 2023
— (no separate OCPD section)—235.203 "Feeders shall be protected against overcurrent."NEW in 2023
215.5 Diagrams of Feeders215.5235.205 Diagrams of FeedersOver-1000-V copy placed in Art. 235 (mirrors 215.5, which stays in Art. 215 for ≤1000 V)
215.6 Feeder EGC ("250.32(B)"; "provisions of 250.134")215.6 ("250.32"; drops "provisions of 250.134")235.206 Feeder EGC"250.32(B)"→"250.32" + dropped "provisions of 250.134" (2020); over-1000-V copy in Art. 235 (2023)

The through-line: the rule content of (A) and (B) is identical in all three editions — the only things that changed are the section number, the voltage threshold (600→1000 V in 2020), the ampacity-table citations (310.15/310.60 → 310.14/315.60 in 2020), and the physical home (Art. 215 → Art. 235 in 2023). The supervised route (C) is the only one with a real content addition, and that landed in 2020, not 2023.

The rest of Article 215: what renumbered in 2023

The over-1000-V relocation is the headline, but the 2023 restructuring also reshuffled the ≤1000 V feeder sections. The 215.2 subsections were relettered as the article was reorganized:

2017 / 20202023ContentChange
215.2(A) "Feeders Not More Than 600 Volts" (2017) / "Not More Than 1000 Volts" (2020)215.2(A)Lead: "ampacity not less than the larger of 215.2(A)(1) or (A)(2) and shall comply with 110.14(C)"600→1000 V in 2020; lead reworded 2020→2023 (Article-220 load-calc citation dropped in 2020)
215.2(A)(1) General (125% rule + derate)215.2(A)(1) / (A)(2)(A)(1) the 125%-continuous + 3 exceptions; (A)(2) the derate / max-load + Info Notes 1–3"allowable ampacity" → "ampacity" (2023); derate gains explicit 310.14 citation (2023)
215.2(A)(2) Grounded Conductor215.2(B)Grounded conductor ≥ 250.122; 250.122(F) parallel exceptionRenumbered (A)(2)→(B); 2023 reworded "that required by 250.122" → "the equipment grounding conductor size required by 250.122"
215.2(A)(3) Ampacity Relative to Service Conductors215.2(C)The 55-A service ruleRenumbered (A)(3)→(C); rule text word-identical
The 55-A rule (now 215.2(C)) is verbatim in both: "The feeder conductor ampacity shall not be less than that of the service conductors where the feeder conductors carry the total load supplied by service conductors with an ampacity of 55 amperes or less." Only the subsection letter moved. The full 215.2(A) ampacity math — the larger-of rule, the 125% multiplier, the 110.14(C) temperature columns — is covered in depth in the 215.2 feeder ampacity article.

Other Article 215 deltas, 2017 → 2023, edition-pinned

Beyond the relocation and the 215.2 relettering, these are the other changes I verified against the on-disk text, each pinned to the edition it landed in:

Edition-of-origin for 215.15 and 215.18: both are absent from the on-disk 2017 scan and the on-disk 2020 scan (which cuts off at 215.12), so I can confirm they are new by 2023 but cannot pin whether they first appeared in the 2020 or 2023 cycle from the sources on disk. They are labeled "NEW in 2023" (i.e., present in 2023, absent from the earlier on-disk editions) — not "added in the 2023 cycle." This is a disclosed source boundary, not an assertion.

The edition history, verified line by line

Every section above was checked against the three on-disk sources — the 2017 full scan, the 2020 scan (which contains the complete Article 215 body), and the 2023 NEC CSV — by verify_art46.py (97 checks, all passing). The verifier normalizes line-wrap hyphenation, soft-hyphens, the disclosed OCR spots ("tts" for "its", "311.60" for "315.60", the 2020 "(l)"-for-"(1)" and "cunductors/grmerator/slwll" artifacts), and the 2017 page-footer text that intrudes into the scan, so only real wording changes survive. The result, pinned to editions:

Worked examples (all computed by the shipped core under node)

Conductor picks from pickConductor31016 and breaker steps from nextStdBreaker in app.js (75 °C column). Transformer full-load current uses the standard nameplate formula I = kVA·1000 / (V·1.732). Every number below was produced by compute_art46.js under node — no hand math.

EX1 — 235.202(A): size from the sum of transformer nameplate ratings

A 4160 V feeder (over 1000 V, so 235.202 applies) supplying two 500 kVA transformers, transformers only.
Nameplate current at 4160 V = 500·1000 / (4160·1.732) = 69.40 A each.
235.202(A): ampacity ≥ sum = 2 × 69.40 = 138.80 A.
Core pick(138.80 A, Cu, 75 °C) = 1/0 AWG Cu (150 A).
[2017/2020: identical math under 215.2(B)(1); only the section number and table differ.]
The nameplate current is taken at the 4160 V feeder voltage (primary side). This is the headline (A) rule — sum the nameplate ratings, transformers only.

EX2 — 235.202(B): the relocated 125% rule

A 4160 V feeder supplying one 500 kVA transformer (69.40 A) plus 20 A of utilization equipment operated simultaneously.
235.202(B): ampacity ≥ 69.40 + 125% × 20 = 69.40 + 25 = 94.40 A.
Core pick(94.40 A, Cu, 75 °C) = 3 AWG Cu (100 A).
The 125% is applied to the simultaneously-operated utilization load, not the transformer (the transformer is taken at 100% nameplate).

EX3 — 235.202(C): the supervised route and its edition-pinned ampacity reference

A supervised over-1000-V feeder (all 235.202(C) conditions met).
2017 (215.2(B)(3)): sizing "determined by qualified persons under engineering supervision" — no ampacity-table reference.
2020 (215.2(B)(3)): adds "in accordance with 310.14(B) or 315.60(B)" (scan OCR "311.60(B)").
2023 (235.202(C)): "in accordance with 310.14(B) or 315.60(B)" (cleaned).
No conductor pick here — the whole point is that a qualified person under engineering supervision determines the size, anchored to the ampacity tables from 2020 onward.

EX4 — 215.2(C): the 55-A service-relative rule (renumbered from 215.2(A)(3))

A 50-A service (8 AWG Cu service conductors, 50 A) feeding a feeder that carries the total 35-A load.
215.2(C) [2017/2020: 215.2(A)(3)]: where the service conductors are ≤ 55 A and carry the total load, feeder ampacity ≥ the service conductor ampacity = 50 A (not the 35-A load).
Core pick(50 A, Cu, 75 °C) = 8 AWG Cu (50 A).
The rule text is word-identical across editions; only the subsection letter moved (A)(3)→(C).

EX5 — 215.2(B): the grounded-conductor floor per 250.122 (renumbered from 215.2(A)(2))

An 800 A feeder OCPD.
215.2(B) [2017/2020: 215.2(A)(2)]: the feeder-circuit grounded conductor shall not be smaller than the 250.122 size for the OCPD.
Table 250.122 row "800" = 1/0 Cu (verified against the on-disk 2023 CSV 250.122 row "800 1/0 3/0").
2023 reworded this subsection to "the equipment grounding conductor size required by 250.122" — same table, same floor, tighter wording.

EX6 — 215.10: the 2023 600→1000 V delta in action

A 1200 A feeder disconnect on a 1000/577 V solidly grounded wye (577 V to ground).
215.10 applies to disconnects ≥ 1000 A, >150 V to ground, "not exceeding [600 / 1000] volts phase-to-phase":
2017 + 2020 (ceiling "600 volts phase-to-phase"): 1000 V > 600 V → NO ground-fault protection required.
2023 (ceiling "1000 volts phase-to-phase"): 1000 V ≤ 1000 V → ground-fault protection of equipment REQUIRED per 230.95.
Core nextStdBreaker(1200 A) = 1200 A standard disconnect.
This is the most consequential numeric delta in the article: the same 1000/577 V feeder disconnect is legal without GFPE under 2017/2020 and non-compliant without it under 2023.

Gotchas

The method, step by step

  1. Determine whether the feeder is over 1000 V ac / 1500 V dc, nominal. If so, in the 2023 edition apply 235.202 (Article 235 Part III), not Article 215. If ≤1000 V, apply 215.2(A) (the math in the 215.2 ampacity article).
  2. Translate any legacy 2017/2020 "215.2(B)" citations to 2023 "235.202" using the relocation map above.
  3. Size the conductors per 235.202: (A) sum of transformer nameplate ratings (transformers only); (B) nameplate ratings + 125% of simultaneously-operated utilization; or (C) qualified persons under engineering supervision (anchored to 310.14(B)/315.60(B) since 2020). Use the 315.60 ampacity table (310.14 where applicable).
  4. Size the grounded conductor ≥ 250.122 (250.122(F) parallel exception applies).
  5. Provide overcurrent protection per 235.203 (over-1000-V) / 215.3 (≤1000 V) — 125% of continuous load.
  6. Apply 215.10 ground-fault protection of equipment where the disconnect is ≥1000 A on a >150 V-to-ground wye ≤1000 V phase-to-phase (2023 ceiling; 600 V in 2017/2020) per 230.95.
  7. Apply the 55-A rule (215.2(C)) where a ≤55 A service carries the total feeder load.
  8. Verify against the adopted edition in your jurisdiction (2017/2020/2023 documented here; 2026 changes out of scope).

FAQ

Where did the over-600-V feeder rules go in the 2023 NEC?

In 2017 they were 215.2(B) "Feeders over 600 Volts", inside Article 215. In 2020 the heading became "Feeders over 1000 Volts" but it stayed at 215.2(B). In 2023 the whole over-1000-V feeder set moved to the new Article 235 Part III: 215.2(B)(1)→235.202(A), (B)(2)→235.202(B), (B)(3)→235.202(C). Article 215 in 2023 covers feeders "not over 1000 volts ac or 1500 volts dc, nominal" only.

How do you size a feeder that supplies only transformers?

235.202(A) (2017: 215.2(B)(1)): ampacity not less than the sum of the nameplate ratings of the transformers supplied when only transformers are supplied. Word-identical in all three editions. Sum the nameplate full-load currents and pick conductors from the ampacity table to meet that total.

What is the 125 percent rule in 235.202(B)?

For a feeder supplying transformers AND utilization equipment: ampacity ≥ sum of transformer nameplate ratings + 125% of the designed potential load of the utilization equipment operated simultaneously. The 125% mirrors continuous-load logic (simultaneous load treated as continuous). Word-identical across editions (2017 215.2(B)(2)).

What changed in the supervised-installation rule (235.202(C))?

2017 (215.2(B)(3)) had no ampacity-table reference. 2020 added "in accordance with 310.14(B) or 315.60(B)" (scan prints 311.60(B) OCR). 2023 cleaned it to 315.60(B). And "over 600-volt systems" became "over 1000-volt systems."

Why does a 1000-V wye feeder need GFPE in 2023 but not 2017?

215.10's phase-to-phase ceiling was "not exceeding 600 volts" in 2017 and 2020, and "not exceeding 1000 volts" in 2023. A 1200 A disconnect on a 1000/577 V wye is above the 600 V ceiling (no GFPE) under 2017/2020 but at/under the 1000 V ceiling (GFPE required, per 230.95) under 2023.

What is the 55-ampere rule, and why did its number change?

215.2(C) (2023): feeder ampacity not less than the service conductor ampacity where the service conductors (≤55 A) carry the total feeder load. In 2017/2020 it was 215.2(A)(3). The 2023 restructuring relettered it (A)(3)→(C); the rule text is word-identical.